BAY AREA COOLING TOWER COATING SPECIALISTS
Cooling Tower Epoxy Coating & Recoating in the Bay Area
Epoxy coating for steel cooling towers that stops corrosion, seals leaks and extends tower life. Surface-prepped, coated and inspected by a San Jose-based crew with 40 years on Northern California towers
Why Choose us
40 yrs
Continuous service across Northern California
Confined Space
and Fall Protection certified crew
ASHRAE 188
Work documented to meet or exceed
100+ towers
Cleaned per year
Why Tower & Scrubber Solutions?
The Right Cooling Tower Coating Starts With the Right Preparation
A lasting cooling tower epoxy coating depends on more than the product itself. Surface preparation, steel condition, moisture, temperature, and the coating system all decide how long the protection holds. Our approach starts with inspecting your tower and defining the scope needed to stop corrosion and protect the structure.
Whether you need epoxy coating for steel cooling towers, a waterproof coating for basins and casings, or complete cooling tower recoating services, we plan the work around your facility.
Services
Cooling Tower Solutions Built Around Your Facility
Epoxy Coating for Steel Towers
Cooling tower epoxy coating for steel basins, casings and frames to resist corrosion and moisture.
Cooling Tower Recoating
Recoating services for towers with peeling, blistering or failed coatings, from surface prep to final inspection.
Waterproof Coating & Leak Protection
Cooling tower waterproof coating for basins and casings to seal leaks and limit water damage.
Structural Repair Before Coating
Frame, casing and basin repair so the coating goes on sound steel and lasts longer.
BEFORE INSTALLATION BEGINS
Every Cooling Tower Coating Project Starts With the Details
Inspection & Assessment
Every project begins with an inspection of your tower’s steel, basin, casing and frame, including corrosion, coating failure, leaks and moisture damage.
Coating Plan
Based on inspection data, we develop a detailed scope covering surface preparation, the epoxy coating system, waterproof coating areas, and a schedule that fits your shutdown window.
Surface Prep & Coating Application
Our HAZWOPER-40 certified crews handle surface preparation, repairs to damaged steel, and application of epoxy coating for steel cooling towers, including cooling tower recoating services for basins, casings and frames.
Inspection & Compliance Documentation
After application, we inspect the finished coating, verify it meets project requirements, and provide documentation aligned with ASHRAE 188 and regulatory requirements.
COATING PROCESS
From Initial Inspection to Coating Planning
Assess the Existing Tower
Review the current coating, steel condition, areas of corrosion or leaks, operating requirements, and project objectives.
Select the Right Coating System
Match the epoxy or waterproof coating to your tower’s materials, operating environment, and exposure, whether it is a full recoat or targeted protection of the basin and casing.
Plan Surface Prep and Access
Define the surface preparation method, scaffolding or access needs, containment, and confined space requirements for basins and enclosed areas.
Schedule Around Your Operations
Build a project timeline around your shutdown windows and uptime needs, with clear milestones from preparation through coating cure and final inspection.
FAQ
Frequently asked questions
What is cooling tower epoxy coating and why is it used?
Cooling tower epoxy coating is a protective layer applied to steel surfaces such as the basin, casing and frame. It helps resist corrosion, moisture and chemical exposure, and it extends the life of the tower. The right system depends on the tower’s materials, condition and operating environment.
When does a cooling tower need recoating?
Can epoxy coating be used on steel cooling towers?
What factors affect cooling tower recoating costs?
How long does a cooling tower coating project take?
The timeline depends on tower size, surface condition, preparation needs and coating cure time. We define the schedule during the planning stage and align it with your shutdown windows and uptime requirements.