BAY AREA COOLING TOWER COATING SPECIALISTS

Cooling Tower Epoxy Coating & Recoating in the Bay Area

Epoxy coating for steel cooling towers that stops corrosion, seals leaks and extends tower life. Surface-prepped, coated and inspected by a San Jose-based crew with 40 years on Northern California towers

Why Choose us

40 yrs

Continuous service across Northern California

Confined Space

and Fall Protection certified crew

ASHRAE 188

Work documented to meet or exceed

100+ towers

Cleaned per year

Why Tower & Scrubber Solutions?

The Right Cooling Tower Coating Starts With the Right Preparation

A lasting cooling tower epoxy coating depends on more than the product itself. Surface preparation, steel condition, moisture, temperature, and the coating system all decide how long the protection holds. Our approach starts with inspecting your tower and defining the scope needed to stop corrosion and protect the structure.

Whether you need epoxy coating for steel cooling towers, a waterproof coating for basins and casings, or complete cooling tower recoating services, we plan the work around your facility.

Services

Cooling Tower Solutions Built Around Your Facility

Epoxy Coating for Steel Towers

Cooling tower epoxy coating for steel basins, casings and frames to resist corrosion and moisture.

Cooling Tower Recoating

Recoating services for towers with peeling, blistering or failed coatings, from surface prep to final inspection.

Waterproof Coating & Leak Protection

Cooling tower waterproof coating for basins and casings to seal leaks and limit water damage.

Structural Repair Before Coating

Frame, casing and basin repair so the coating goes on sound steel and lasts longer.

BEFORE INSTALLATION BEGINS

Every Cooling Tower Coating Project Starts With the Details

Inspection & Assessment

Every project begins with an inspection of your tower’s steel, basin, casing and frame, including corrosion, coating failure, leaks and moisture damage.

Coating Plan

Based on inspection data, we develop a detailed scope covering surface preparation, the epoxy coating system, waterproof coating areas, and a schedule that fits your shutdown window.

Surface Prep & Coating Application

Our HAZWOPER-40 certified crews handle surface preparation, repairs to damaged steel, and application of epoxy coating for steel cooling towers, including cooling tower recoating services for basins, casings and frames.

Inspection & Compliance Documentation

After application, we inspect the finished coating, verify it meets project requirements, and provide documentation aligned with ASHRAE 188 and regulatory requirements.

COATING PROCESS

From Initial Inspection to Coating Planning

1

Assess the Existing Tower

Review the current coating, steel condition, areas of corrosion or leaks, operating requirements, and project objectives.

2

Select the Right Coating System

Match the epoxy or waterproof coating to your tower’s materials, operating environment, and exposure, whether it is a full recoat or targeted protection of the basin and casing.

3

Plan Surface Prep and Access

Define the surface preparation method, scaffolding or access needs, containment, and confined space requirements for basins and enclosed areas.

4

Schedule Around Your Operations

Build a project timeline around your shutdown windows and uptime needs, with clear milestones from preparation through coating cure and final inspection.

FAQ

Frequently asked questions

What is cooling tower epoxy coating and why is it used?

Cooling tower epoxy coating is a protective layer applied to steel surfaces such as the basin, casing and frame. It helps resist corrosion, moisture and chemical exposure, and it extends the life of the tower. The right system depends on the tower’s materials, condition and operating environment.

Common signs include rust, peeling or blistering coating, leaks, pitting on steel surfaces, and visible corrosion around seams and fasteners. Recoating earlier is usually more cost-effective than waiting until the steel needs structural repair. An inspection can confirm whether a full recoat or targeted repair is the better option.
Yes. Epoxy coating for steel cooling towers is widely used on basins, casings, frames and other steel components. The coating system, surface preparation and application method should be matched to the tower and the exposure it faces.
Costs depend on the tower size, the condition of the steel, the surface preparation required, the coating system selected, site access, and the project schedule. A site inspection is the most reliable way to get an accurate estimate.

The timeline depends on tower size, surface condition, preparation needs and coating cure time. We define the schedule during the planning stage and align it with your shutdown windows and uptime requirements.

Scroll to Top

Get In Touch

Request an Engineering Audit

Tell us about your system. We’ll handle the rest.